Revisión de un SAI y su banco de baterías para verificar la autonomía en un hospital

Hospital UPS runtime: how to calculate, test and maintain it

Hospital UPS runtime is not a fixed figure on a specification sheet. It depends on the measured critical load, battery condition and temperature, UPS efficiency, and the time needed for the alternative supply to take over. This article explains how to turn those factors into a defensible estimate and verify it through a planned, traceable test.

It covers clinical operating scenarios, manufacturer discharge curves, variation between battery blocks, coordination with the generator and safe end criteria. It also sets out the data to record during acceptance and the trends to monitor throughout the battery bank’s life. The aim is to demonstrate useful operating time under the site’s defined electrical and clinical conditions without disrupting care or unnecessarily shortening battery life.